
Quality
Quality is a system, not a department
Three certifications, one documentation trail. Every batch you receive carries the measurement data to prove it.
99.6%
Product yield
98.5%
On-time delivery
<0.1%
Complaint rate
24 h
Quality response
Certifications
Certified for the markets you ship to
Original certificates are available on request. Scope statements are provided with every quote for regulated programs.
ISO 9001:2015
Cert. ref: QMS-0925
Quality Management System — applies to all manufacturing and service processes.
Certificate copy available on request →
ISO 13485:2016
Cert. ref: MD-1148
Medical Devices QMS — applies to molding, machining, cleaning and packaging of medical components.
Certificate copy available on request →
IATF 16949:2016
Cert. ref: AT-2201
Automotive QMS — applies to injection molding and CNC machining for automotive programs.
Certificate copy available on request →
QC Flow
IQC → IPQC → FAI → OQC
Four inspection gates, each with defined sampling plans, records and escalation paths.
- IQC
Incoming QC
Material certificates, spectrometer verification, AQL sampling on purchased parts.
- IPQC
In-Process QC
First-off approval, hourly SPC sampling, poka-yoke fixtures, in-cavity monitoring on molding.
- FAI
First Article Inspection
Full dimensional layout per AS9102-style report on new or revised tooling.
- OQC
Outgoing QC
AQL 0.65 final inspection, cosmetic review, documentation package per customer requirement.
Metrology
Inspection equipment
| Equipment | Specification | Qty |
|---|---|---|
| CMMDimensional layout, FAI, PPAP | Zeiss CONTURA, MPEe = 1.9 + L/300 µm | 2 |
| Video measuring machine2D features, small parts | Olympus / 3D FAMILY, 0.5 µm | 3 |
| Optical comparatorProfile inspection | Nikon V-20B | 2 |
| SpectrometerMetal alloy verification | Oxford FM MASTER | 1 |
| Surface roughness testerRa / Rz verification | Mitutoyo SJ-410 | 2 |
| Tensile testerMaterial & weld strength | INSTRON 3365, 5 kN | 1 |
| SpectrophotometerCosmetic color control | X-Rite Ci64 (ΔE) | 2 |
| Salt spray chamberCorrosion testing | Q-FOG CCT-450 | 1 |

Request for Quotation
Need a quality package with your quote?
Every quotation can include FAI reports, material certifications and PPAP documentation. Tell us what your program requires — we reply within 2 business days.
Reply within 2 business days · NDA available on request
